Transportation of Vehicles
The experience of our personnel in vehicle deliveries is more than 17 years. Over this period of time we have arranged for delivery of more than 27.000 trucks and 15.000 semi-trailers.
All our drivers have a wealth of experience in international transportation of goods, have acquired the skills of safe and eco-driving, which is confirmed by the victory of our employees in the Russian stage of the eco-driving competition Optifuel Challenge 2012 (organised by Renault Trucks Russia & CIS)
Types of vehicles transported:
![]() |
Towed vehicles (car carrier trailers, container vehicles, curtain-sided and refrigerated semi-trailers). |
|
![]() |
Self-propelled vehicles (tractor units, chassis, tipper trucks, refrigerator and box trucks, construction and special-purpose vehicles, light vehicles); |
We provide for delivery of transport and equipment to dealers on a turnkey basis:
- Pick-up of vehicles from any warehouse or factory
- Visual inspection and completeness check
- Storage of vehicles, loading and unloading operations
- If requested, we provide additional equipping and refuelling of vehicles
- Insurance of vehicles
- Own staff of drivers will deliver vehicles under their own power
How we deliver:
- under own power (our drivers arrive at the place of pick-up of vehicles and transport them to the point of destination);
- by car carrier trailer (on a low-bed semi-trailer);
- by sea (Ro-Ro, ferries);
- by rail (flat wagon);
- using the multimodal schemes (by car carrier trailer + maritime transport + under own power).
Our drivers constantly advance in their professional skills, complete training before transportation of some specific types of vehicles, for this very reason Mercedes-Benz Company entrusts us with its vehicles, and chooses our drivers as pilot instructors for its presentations, test drives and promotion tours.
Projects implemented by FAKTORIALL:
750 road trains for a Russian transport company. Project implementation period: 7 months. Route: Germany - Russia (under own power)
|
300 road trains for a Russian retail network within 2.5 months. Route: Germany - Russia (under own power and by sea + under own power) Project implementation period: 3 months
|
350 tractor units in peak load season in November-mid December Route: Germany (the port of Lübeck) to Moscow and Saint Petersburg. Project implementation period: 1.5 months
|
We are trusted by:
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |